ROM Release – Architectural Opening & Building Dedication of the Micheal Lee-Chin Crystal, June 2nd

19 03 2007

Extrait du communiqué de presse officiel:

« At sunset on Saturday, June 2, 2007, the Royal Ontario Museum will hold its official Architectural Opening and Building Dedication – a free public event to celebrate the construction completion of the Micheal Lee-Chin Crystal. […]

For a special period until June 10, enthusiasts of contemporary design have a once-in-a-lifetime chance to enjoy Daniel Liebskind’s architectural design in its purest form throughout the building. During this period only, most of the building’s unique spaces will be empty and open to the public before installation of permanent exhibits, along with the rest of the building. […] »

Pour le communiqué de presse officiel complet, veuillez consulter le lien suivant:

Presse release – ROM Opening

Pour consulter le micro-site internet de la construction du nouveau pavillon, veuillez visiter le lien suivant:

Building website – ROM

(Remerciements à Nicolas Marier pour l’information)


Actions

Information

Laisser un commentaire

Entrez vos coordonnées ci-dessous ou cliquez sur une icône pour vous connecter:

Logo WordPress.com

Vous commentez à l'aide de votre compte WordPress.com. Déconnexion / Changer )

Image Twitter

Vous commentez à l'aide de votre compte Twitter. Déconnexion / Changer )

Photo Facebook

Vous commentez à l'aide de votre compte Facebook. Déconnexion / Changer )

Photo Google+

Vous commentez à l'aide de votre compte Google+. Déconnexion / Changer )

Connexion à %s




%d blogueurs aiment cette page :